Preparation before rice color sorter operation
2021-06-20 00:00
Hefei Dream Plus Vision rice color sorters are all debugged before leaving the factory, and can only leave the factory after passing the debugging. However, according to the actual situation of the materials on the customer's site, our company's engineers will further debug the ore color sorter to achieve a more reasonable ore color sorting effect. After debugging, other personnel are strictly prohibited from disassembling and repairing the machine privately, otherwise it will affect the life of the machine and the normal operation of the color sorter. The following is a description of the preparation work of the rice color sorter before operation by Hefei Dream Plus Vision, which is described as follows:
Hefei Dream Plus Vision rice color sorters are all debugged before leaving the factory, and can only leave the factory after passing the debugging. However, according to the actual situation of the materials on the customer's site, our company's engineers will further debug the ore color sorter to achieve a more reasonable ore color sorting effect. After debugging, other personnel are strictly prohibited from disassembling and repairing the machine privately, otherwise it will affect the life of the machine and the normal operation of the color sorter. The following is a description of the preparation work of the rice color sorter before operation by Hefei Dream Plus Vision, which is described as follows:

1. Check whether there are foreign objects in the vibrating hopper and conveyor belt. If there are any, they need to be cleaned up to avoid affecting the final effect of ore color sorting.
2. Turn on the air compressor and wait until the pressure displayed on the pressure gauge of the air compressor reaches above 0.5MPa (generally during the initial commissioning, the maximum pressure of the air compressor is adjusted to 0.6MPa) before proceeding to the next step of ore color sorting.
It is worth noting that the waste liquid in the air compressor must be drained before each opening of the air compressor. Especially in winter, if there is water in the pressure regulating valve that has not been drained, it is easy to freeze, airflow is blocked, and the ore color sorting work cannot be carried out normally. If there is freezing, it can be baked with a heat source (≤45℃). Do not adjust the pressure regulating valve frequently to avoid damaging the accessories in the pressure regulating valve.